COMMNUNITY PLANNING
![Partial view of a recommendations map for the study area](https://static.wixstatic.com/media/90d75e_79a8080b50ab4dbea3828d12bbf587ca~mv2.jpg/v1/crop/x_1114,y_296,w_561,h_561/fill/w_286,h_286,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/RCFW_Preliminary%20Recommendation%20map_Final%20Report.jpg)
ROCK CREEK FAR WEST
As the prime contractor, Nspiregreen led a consultant team to develop the livability study. At the completion of the project, the two Advisory Neighborhood Commissions passed resolutions supporting the final recommendations.
![Group of people in a street corner collecting street data](https://static.wixstatic.com/media/90d75e_f0885aef04ca494596bb1c093c1a39d2~mv2.jpg/v1/crop/x_772,y_0,w_2733,h_2728/fill/w_286,h_285,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/FSEIII%20-%20Street%20Survey%20with%20community.jpg)
FAR SOUTHEAST III
Nspiregreen was a subcontractor. We led the public engagement.
![Design Renderings of a Bike Lane, showin bikers and pedestrians](https://static.wixstatic.com/media/90d75e_dd79dafc314e4bfa88d5407d2e9a442b~mv2.png/v1/crop/x_446,y_219,w_564,h_563/fill/w_286,h_285,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Design%20Renderings%20showing%20a%20Bike%20Lane%2C%20and%20pedestrians.png)
ROCK CREEK EAST II
As the Project Director for the study, we shared project organization and management roles with Nelson Nygaard, the prime contractor. This meant participating in all aspects of the project.
![Partial view of an Existing Studies map](https://static.wixstatic.com/media/90d75e_b2512de6f9644da1b6387179146d4abc~mv2.jpg/v1/crop/x_1251,y_506,w_1392,h_1392/fill/w_286,h_286,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/BELivability%20_Existing%20studies%20map.jpg)
BROOKLAND-EDGEWOOD
Nspiregreen was a subcontractor. We led the previous plan review and field observations including assessing bicycle and pedestrian infrastructure. We supported public engagement.
![RCEI-Plans Review Board](https://static.wixstatic.com/media/90d75e_21e61c718d61429480197dc0bc567c33~mv2.jpg/v1/crop/x_2465,y_1834,w_1002,h_990/fill/w_286,h_283,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/RCEI-Plans%20Review%20Board.jpg)
ROCK CREEK EAST I
Nspiregreen was a subcontractor. We led the public engagement and previous plan review. We supported concept development and the final report.